Indicates the optimum, convenient and if possible the most economically viable trench route for the installation of new networks.

 A new trenching route is planned in the specified corridor and the existing underground network is detected and mapped.

Corridors are between 3 to 5 meters depending on the type of installation planned.

Establish profiles of existing utility lines, propose new installations and cross-sections of roads.

Sample Map